AliveCommerce  /  Capabilities  /  Reduce manual work

Reduce manual work

Somebody in your business is the integration. They take data out of one system, reshape it, and put it into another, several times a day, and have done for years. That work is invisible until they're off sick.

Does this sound like you?

Tick what applies. The count changes what we'd recommend, and sometimes the recommendation is to do nothing yet.

What's actually causing it.

Almost never carelessness. Usually the predictable result of a decision that made sense at the time.

01

The systems were bought separately

Each was chosen to solve one department's problem, by different people, in different years. None was selected on how well it would talk to the others, because at the time there was nothing to talk to.

02

The gap got filled by a person

When two systems don't connect, someone bridges them manually. It works, so nobody escalates it. Over years that becomes a full-time role nobody ever budgeted for.

03

Nobody owns the space between

Your MSP owns infrastructure. Each vendor owns their product. The handoffs between systems belong to no one, so they're never anyone's improvement project.

What we do about it.

In this order, because doing them out of order is how these projects fail.

Map what actually happens

Not the documented process — the real one, including the workarounds and the reasons behind them. Usually the first honest picture anyone has had of it.

Automate the handoffs first

Integration between existing systems is almost always cheaper and less disruptive than replacing anything. We start there and only discuss replacement if it genuinely earns it.

Rebuild the process, not just the tooling

Automating a bad process makes it faster and no better. Some steps exist only because of a limitation that no longer applies, and those get removed rather than automated.

Leave it documented and owned

The system is only half of it. Your team needs to understand what runs, what breaks, and what to do about it — whether we stay involved or not.

Typical first phase
4 to 10 weeks
One process, mapped and automated end to end
What it usually costs
Published ranges
See the cost guide before you call us
Most common trigger
Someone left
Or is about to, and took the process with them

What it looks like in practice.

Distribution · 80 staff · 14 months

A twelve-year-old ERP nobody could safely touch

Three exports and a nightly spreadsheet held order flow together. We mapped the real process, replaced the seams with integrations, and left the ERP exactly where it was.

31 hrs
returned per week

Straight answers.

Tell us what's breaking.

We'll tell you which part of this we'd put on it, roughly what it costs, and whether it's worth doing at all — including when the honest answer is that you don't need us.

Start the Conversation