AliveCommerce  /  Industries  /  Manufacturing

Manufacturing

The ERP was specified when you were a smaller company, customised every year since to keep up, and is now the reason you can't upgrade. Meanwhile the quality records are in binders and the person who knows how line three actually runs is eighteen months from retiring.

Common ERPsEpicor · Business Central · NetSuite · Odoo
Frequent triggerAn ISO or customer audit
OnsiteAvailable nationally

What we see most.

Tick what applies. The count changes what we'd recommend, and sometimes the recommendation is to wait.

What we do here.

Across all three layers, because problems in this sector rarely stay in one.

Knowledge and process

Quality records, work instructions and process capture

Auditors ask for evidence, not intentions. Getting records searchable and instructions current is usually the first project and the one with the clearest deadline.

  • Onsite conversion of quality and inspection records
  • Work instructions rebuilt for the station, not the binder
  • Process mapping by observation on the floor
  • Certification and competency tracking
Applications

ERP configuration, integration and shop-floor data

The ERP is rarely the problem on its own. The problem is what sits around it — data that can't get in, reports that can't come out, and customisations nobody documented.

  • ERP administration and upgrade assessment
  • Shop-floor data capture and integration
  • Custom applications where no product fits
  • Production and margin reporting
Web and revenue

Customer-facing ordering and technical content

Manufacturers increasingly sell direct, or at least need distributors and customers to self-serve technical documentation and order status.

  • Customer portals against live ERP data
  • Technical documentation and spec sheets online
  • Distributor and dealer portals
  • AODA compliance where required

The systems you probably run.

Each has a page on Champion1 covering what typically breaks and what we do about it.

Who we usually work with.

And the sentence that tends to start the conversation.

COO / Plant ManagerOwns throughput and downtime“Why does the same issue keep costing us a shift?”
Quality / QA ManagerOwns audit readiness“Could we produce three years of records this week?”
Owner / PresidentOften the decision maker under 75 staff“What happens when he retires?”
IT DirectorOwns the systems, usually alone“I'm the only one who knows how any of this works.”

What it looks like in practice.

Manufacturing · 140 staff · 7 months

Quality records lived in binders on the floor

An ISO audit forced the issue. Onsite conversion of eleven years of records, then a documentation system the quality team now maintains without us.

First
attempt audit pass

Straight answers.

Tell us what's breaking.

We'll tell you which part of this we'd put on it, roughly what it costs, and whether it's worth doing at all — including when the honest answer is that you don't need us.

Start the Conversation