Past deadline, past budget, and every status update sounds like the last one. The hardest part isn't the technical problem. It's that everyone involved now has a position to defend, which makes an honest picture of where things stand almost impossible to get from the inside.
Tick what applies. The count changes what we'd recommend, and sometimes the recommendation is to do nothing yet.
Almost never carelessness. Usually the predictable result of a decision that made sense at the time.
Both sides signed something neither fully understood, in good faith. Discovery then finds the real requirements, and the commercial structure has no room for them.
Under a fixed scope, raising a problem costs the vendor money and costs you time. So problems surface late, when they're expensive, rather than early when they're cheap.
Your side owned requirements, theirs owned delivery, and the space between — integration, data, change, adoption — belonged to nobody until it became the reason for the delay.
In this order, because doing them out of order is how these projects fail.
Independently, in writing, with no interest in the answer. What's built, what works, what's salvageable, and what the remaining options genuinely cost.
Sometimes the recommendation is to stop, or to keep the current vendor with a different structure. We're not trying to inherit the project — we're trying to give you a decision you can defend.
Nothing new gets built until what exists is understood and working. Adding to an unstable base is how recoveries become second failures.
If the commercial model caused the failure, replacing the vendor inside the same model reproduces it. Usually the fix is how the work is bought, not who does it.
Same team either way. The difference is whether this has an ending.
Assessment first, recovery second, as separate decisions. You can buy the assessment and take it elsewhere — that happens and it's fine.
Project recoveryWhen the recovery is really a support problem. We take over products whose vendor has gone dark or whose developer has left, and keep them running.
Product recoveryThe assessment recommended keeping the vendor and changing the contract. Both sides agreed within a fortnight, which surprised everyone including us.
Only if that's genuinely the answer, and it often isn't. Most failing projects have a structural cause rather than an incompetent supplier, and replacing the supplier inside the same structure reproduces the failure.
Yes, and plenty do. Fixed price, one to three weeks, written independently. You can act on it with us, with your existing vendor, or with someone else entirely.
Usually, once it's clear the assessment isn't a prelude to blame. We ask for access and conversation, not a defence. Vendors are generally as stuck as you are and often relieved.
Then we say so, in writing, with the reasoning. Sunk cost is the most expensive argument in this category and someone independent has to be willing to name it.
We'll tell you which part of this we'd put on it, roughly what it costs, and whether it's worth doing at all — including when the honest answer is that you don't need us.